![]() |
|
Click here for a printable version
Gazania
Sunbathers
The SunBathers feature large showy flowers in bright gold and orange. The flowers lack the typical dark eye present on most Gazanias, giving these a clean, clear appearance. The flowers have a semi double form which inhibits them from closing at night like seed Gazania. The SunBathers can be grown cool but will also perform throughout the heat of the summer for extended performance. They are best suited for 4”, 6” and 1 gallon containers. Typical crop timing is 13-17 weeks including time in propagation
Click here for live online inventory
In the Greenhouse…….
Propagation Media Bottom Heat Rooting Hormones Misting Trimming Propagation Cycle: 5 weeks For recommended chemical controls for disease and insects please consult
The Flower Fields Federal Disease Control Chart
(463K) and The Flower Fields Federal Insect
& Mite Control Chart (541K) at www.ecke.com. Always consult the chemical’s
label for rates, mixing instructions and restrictions. CROP SCHEDULING If
you have questions about Gazania Sunbathers in production please post your question on our
live bulletin board at www.EckeRanchTechHelp.com or call 760-753-1134 and choose option#3 for
Technical Support. © 2007 Ecke Ranch
Gazania can be propagated in various tray sizes including 72,84, and 105’s.
Media
Choose a media with the following traits:
Irrigation/Fertilization
Temperature/Humidity
SunBathers can be grown successfully at a wide range of temperatures but for best results the crop should be established warm. As root growth and top growth begins temperatures can be reduced.
Temperature regime:
Establishing temperature: 62-68°F/17-21°C average daily temperature
Temperatures for growing on: 68°F/21°C average daily temperatures and 55-60°F/13-17°C night temperatures
Relative Humidity:
Light
SunBathers prefer bright light. For best results
Provide:
Spacing
Establish plants pot tight than space to:
Pinching
Plant Growth Regulators
Adequate spacing and good light levels are the best way to control stretch. If needed, SunBathers respond to:
*Apply any PGR applications prior to visible bud set to avoid delay in time to flower
Insect and Disease Concerns
Insects
Diseases
*Total crop time may be increased with cooler temperatures.
Late PGR application will also increase crop time.
Product
# Liners per Pot
Weeks to Establish
Total Crop Time from Transplant (weeks)
4"
1
2-3
8
6"
1
2-3
9
1 gallon
1
2-3
10-12